Masonry & Construction Engineering

Concrete Calculator

Calculate exact concrete yardage, 60-lb and 80-lb pre-mixed bag quantities, and project costs for slabs, footings, post holes, and stairs with 10% waste buffers.

Quick Presets:
Planning a full driveway pour? Model gravel subbase, rebar grid, and contractor quotes per sq ft:Driveway Cost Calculator →

Select Project Structure

4" (0.33 ft)

Standard patio: 4" | Residential driveway: 5" | Heavy duty RV pad: 6".

+10%
0% (Exact)5% (Simple Forms)10% (Recommended)15% (Rough Ground)

Project Material Cost Estimator

Concrete Required
2.72Cubic Yards (yd³)
≈ 73.3 Cubic Feet (ft³)
Pre-Mix Bag Options (with 10% buffer)
80-lb Bags (0.60 ft³)
123 bags
60-lb Bags (0.45 ft³)
163 bags
Ready-mix transit trucks: ~0.3 full loads (assuming standard 9.5-yard capacity).
Total Estimated Material Cost:$380.25
Surface Area Footprint:200.0 sq ft
Exact Net Volume (0% buffer):2.47 yd³
50-lb Fast-Set Bags (0.375 ft³):196 bags
Did this calculator solve your problem today?
The 45 Bag Rule: Always remember: Exactly 45 eighty-pound bags (or 60 sixty-pound bags) make 1 cubic yard. If your job exceeds 2 yards (90 bags), call a ready-mix dispatcher.

How to Calculate Concrete Volume: Formulas, Bag Counts & Site Prep

Under-ordering concrete is one of the most stressful mistakes in construction. If a pour runs short, you face a cold joint where old concrete sets before fresh concrete arrives, creating structural weakness. Here is the exact mathematical foundation for ordering ready-mix trucks and pre-mix bags.

The Universal Slab Yardage Formula

For rectangular slabs, patios, sidewalks, and driveways:

Cubic Yards = [Length (ft) × Width (ft) × Thickness (in / 12)] ÷ 27

Example: A 10' × 10' patio at 4" thick = 10 × 10 × (4/12) ÷ 27 = 33.33 ÷ 27 = 1.23 cubic yards. Adding 10% waste = 1.35 cubic yards.

Circular Column & Sonotube Formula

For deck footings, fence post holes, and structural pillars:

Volume = π × [Diameter (in) / 24]² × Depth (ft) ÷ 27

Example: A 12" diameter tube (radius = 0.5 ft) at 4 ft deep = 3.14159 × 0.25 × 4 ÷ 27 = 0.116 cubic yards per column.

Standard Concrete Slab Thickness & Reinforcement Guidelines

ApplicationThicknessBase & Reinforcement
Residential Sidewalk4 inches2–4" compacted gravel; welded wire mesh optional
Backyard Patio4 inches4" gravel base; #3 rebar at 18" on-center
Standard Car Driveway4 to 5 inches4–6" crushed stone base; #4 rebar grid
Heavy Truck / RV Pad6 inches6" crushed base; #4 rebar at 12" on-center grid

Frequently Asked Questions

Why should I add 10% extra concrete to my order?

Natural ground subgrades are never perfectly flat. Formwork flexes under the weight of wet mud, and spillage occurs during raking and screeding. A 10% allowance prevents the nightmare of a short load.

How long does concrete take to cure before driving on it?

Concrete reaches about 50% strength after 3 days, 70% strength after 7 days, and full statutory design strength (typically 3,500 to 4,000 PSI) at 28 days. You can walk on it after 24–48 hours, but wait at least 7 full days before parking passenger cars on a new driveway.